BAKER HUGHES AWARDED MAJOR SUBSEA CONTRACT BY ENI AND PETROCI IN IVORY COAST

Baker Hughes has been awarded a major contract by Eni and its partner Petroci for the Baleine Phase 2 project in Ivory Coast, Africa’s first Scope 1 and 2 net-zero emissions development.
This award, which includes eight deep water trees, three Aptara manifolds, the relevant subsea production control system, and flexible risers and jumpers, strengthens Baker Hughes’ presence in West Africa and unlocks considerable growth potential in the country.
ENI and Petroci made a major discovery on the Baleine prospect in September 2021 and a second discovery in July 2022
Baker Hughes will deliver a configured-to-order product portfolio across subsea production and flexible pipe systems, designed for optimum cost effectiveness, installation and life-of-field value. These deepwater trees and manifolds, supplemented with subsea production controls and flexible pipe systems, provide efficiency and cost-effectiveness under demanding conditions. Their modular design aids in reducing lead times, vital for the economic feasibility of such projects. This contract reflects Baker Hughes’ value proposition of advanced technology, exceptional execution and value, holistic solutions and operational efficiency.
(Source: Baker Hughes)