BAKER HUGHES WILL SUPPLY COMPRESSORS FOR RIO GRANDE LNG PROJECT

Baker Hughes has been awarded an order by Bechtel Energy Inc. (Bechtel) to supply three Main Refrigerant Compressors (MRCs) for NextDecade’s Rio Grande LNG project in the Port of Brownsville, Texas.
In total, Baker Hughes will supply six Frame 7 gas turbines paired with 18 centrifugal compressors across Rio Grande’s first three LNG trains in a parallel configuration arrangement, providing more operational flexibility – for a nameplate capacity of 17.61 MTPA.
The Baker Hughes gas technology solution chosen for Rio Grande LNG provides NextDecade with the highest production levels for the plant’s design, as well as operational flexibility and high availability. The Frame 7 gas turbine is well-proven for its energy efficiency, availability, reliability and maintainability.
Packaging of the turbine/compressor train, a unique Baker Hughes offering, as well as assembly of the compressors and testing of the trains, will take place at Baker Hughes’ facilities in Italy.
(Source: Baker Hughes)