BAKER HUGHES WINS MAJOR CONTRACT FOR CORAL SOUTH

Baker Hughes, a GE company has announced a second major contract for Eni East Africa’s (EEA) Coral South FLNG development, offshore Mozambique, underlining the company’s position as the world’s first and only integrated fullstream provider of products, services and digital solutions that maximize productivity, efficiency and cost reduction.
The contract was awarded in 2Q this year by a joint venture formed by TechnipFMC and JGC Corporation, the lead partner in a consortium that will provide engineering, procurement, construction, installation, commissioning and start-up (EPCIC) of Coral South’s FLNG facility.
The second contract – which was awarded through the former GE Oil & Gas business – will allow BHGE to provide rotating equipment for the power and gas refrigeration process of the new FLNG facility. The order consists of four Turbo-compression trains for mix refrigeration services, using the company’s aeroderivative gas turbine (model PGT25+G4) technology and driving its centrifugal compressors. In addition, the company will provide four Turbo-generation units, also driven by aeroderivative gas turbines (model PGT25+G4).
The components of the turbo compressor trains and turbo-generation units will be manufactured at BHGE Nuovo Pignone facility in Florence, Italy, where the train will be assembled and tested in the Massa facility.
The Coral South FLNG project, the first phase of EEA’s wider plan of development for the world-class gas discoveries made in the Rovuma Basin Area 4, will see the installation of an FLNG facility with a capacity of around 3.4 MTPA, fed by six subsea wells and expected to produce around 5 TCF of gas during its 25 years of production, with an anticipated start-up in mid-2022. The first ever offshore project to start producing gas in Mozambique, it will provide significant local economic benefits through job creation and support the region’s future energy needs. (Source: BHGE)