ENERGEAN FLOWS FIRST GAS AT NORTH EL AMRIYA AND NORTH IDKU OFFSHORE EGYPT
Energean confirmed that first gas has been safely delivered at North El Amriya and North Idku (NEA/NI), offshore Egypt. Gas is being produced from the NEA#6 well and the remaining three wells are expected to be brought online over the course of 2023.
The NEA/NI development, located in shallow water, offshore Egypt, contains an estimated 39 mmboe of 2P reserves (88% gas) with net working interest production expected to peak at 15 – 20 kboed (88% gas) in 2024. The development leverages existing infrastructure and involves the subsea tieback of four wells to Energean’s North Abu Qir PIII platform. Energean sanctioned the project in January 2021, representing a development period from final investment decision to first gas of 2 years and 2 months.
(Source: Energean)