October 02nd, 2023
MPA OF SINGAPORE PROPOSES TO DEVELOP ELECTRIC HARBOUR CRAFT CHARGING POINTS
The Maritime and Port Authority of Singapore (MPA) has issued a call for proposal (CFP) to develop, commission, maintain, and operate electric harbour craft (e-HC) charging points at Jurong Port, Marina South Pier, Pasir Panjang Ferry Terminal, PSA Marine – West Coast Base, and Sebarok Terminal together with the existing licensees and operators of these sites.
The selected proposals will be implemented as a two-year pilot with an option to extend for another year. MPA will work together with the operators to evaluate the various charging technologies implemented and gather information and feedback on the supporting infrastructure and power requirements. The experience gained will contribute towards the development of a charging infrastructure standard for e-HC, the charging infrastructure masterplan, as well as the implementation and operational plans to support e-HC operations in Singapore. MPA plans to progressively roll out the charging infrastructure for e-HC operations in Singapore from 2025.
The CFP follows from an expression of interest launched in July 2023 for proposals to design and promote adoption of full-e-HC in Singapore.
(Source and image: Singapore MPA)
Important News
- TEPCO – DISCHARGE OF FUKUSHIMA CONTAMINATED WATER TO THE OCEAN 27th August 2023
- NORWAY LOGS LARGEST HYDROCARBON DISCOVERY IN A DECADE 12th July 2023
- VOLOCOPTER AND ADP TO OFFER eVTOL SERVICES FOR THE 2024 OLYMPIC GAMES 25th June 2023
exhibitions And conferences
Exhibitions And Conferences
Email The Blog Post
Thank You!
The email has been sent to you successfully.
© Copyright 2023 Energy Global News. All Rights Reserved. | Developed By: Skylark Infotech