NEXTDECADE TO OPTIMIZE RIO GRANDE LNG PROJECT

NextDecade Corporation is optimizing its Rio Grande LNG project (RGLNG). Throughout the course of its pre-FID development activities, NextDecade has worked diligently to reduce the environmental impacts of RGLNG.
The original front-end engineering and design for RGLNG was based on six LNG trains each capable of producing 4.5 million metric tonnes per annum (mtpa) of LNG for export. The technologies that were selected and filed with the Federal Energy Regulatory Commission (FERC) in 2015 and 2016 have evolved over the five-year permitting period; the LNG trains are now more efficient and will produce more LNG with lower total carbon dioxide equivalent (CO2e) emissions. Multiple optimizations have been identified that will lead to the delivery of a world-class LNG project capable of producing 27 mtpa with just five LNG trains instead of six.
Implementation of these optimizations will result in several environmental and community benefits when compared with NextDecade’s original six-train project including (i) approximately 21 percent lower CO2e emissions, (ii) shortened construction timeline for the full 27 mtpa project, (iii) reduced facility footprint, and (iv) an expected reduction in traffic on roadways.
“This is an extremely positive development for all of our stakeholders, as the environmental benefits from these optimizations are significant,” said Matt Schatzman, NextDecade’s Chairman and Chief Executive Officer. “In addition to the emissions reductions we will achieve, these optimizations will reduce the project’s footprint, traffic, and construction schedule, and demonstrate our ongoing commitments to the community in the Rio Grande Valley.”
On account of these optimizations, NextDecade will, in due course, vacate Train 6 as RGLNG is now capable of producing the same planned total LNG volumes with just five trains. Future development of Train 6 will require NextDecade to secure authorization from FERC, the U.S. Department of Energy, and any other relevant federal or state agency with jurisdiction over the export project.
About NextDecade Corporation
NextDecade is a liquefied natural gas (LNG) development company focused on LNG export projects. NextDecade is developing the largest LNG export solution linking Permian Basin and Eagle Ford Shale natural gas to the global LNG market, creating value for producers, customers, and stockholders. Its portfolio of LNG projects includes the 27 mtpa Rio Grande LNG export facility in the Port of Brownsville, Texas.
(Source and image: NextDecade)

1949: BELL HELICOPTERS FIRST TO LAND OFFSHORE

July 16, 2017

As the industry entered the last decade of the 20th century, advancing technology ensued. New depth records for drilling reached 7,625 feet in the Gulf...

Read More+
SOVCOMFLOT CALLS FOR IMPROVED SAFETY ON THE NORTHERN SEA ROUTE

July 15, 2017

President and CEO of SCF Group (Sovcomflot) Sergey Frank stressed the necessity of taking additional measures to ensure navigation safety along the NSR...

Read More+
NOBLE GLOBE TROTTER II TO DRILL OFFSHORE BULGARIA

July 14, 2017

Noble Corporation advised that its ultra-deepwater drillship Noble Globe Trotter II has been hired by Total to drill in the Bulgarian waters of the Black...

Read More+
ExxonMobil EXPANDS IN THE GUYANA-SURINAME BASIN

July 14, 2017

Exxon Mobil Corporation announced today that its subsidiary ExxonMobil Exploration and Production Suriname B.V., along with co-venturers Hess and Statoil,...

Read More+
STATOIL SECURES WEST SATURN DRILLSHIP

July 14, 2017

Statoil Brasil Oleo e Gas Ltda has awarded Seadrill rig contracts for exploration drilling in the BM-S-8 license in the Santos basin. The agreement includes...

Read More+
PROVIDENCE STARTS OPERATIONS IN SOUTHERN PORCUPINE BASIN

July 14, 2017

Providence Resources, the Irish based Oil and Gas Exploration Company provides an operational update regarding Frontier Exploration Licence 2/14 located...

Read More+
STATOIL STRENGTHENS POSITION IN BM-S-8 OFFSHORE BRAZIL

July 14, 2017

Statoil ASA and Queiroz Galvao Exploraçao e Produçao (QGEP) have signed an agreement for Statoil to acquire QGEP’s 10% interest in the BM-S-8 licence...

Read More+
TOTAL AND QATAR PETROLEUM START AL-SHAHEEN OPERATIONS

July 13, 2017

Total and Qatar Petroleum will take over the operatorship of the giant Al-Shaheen offshore oil field for a period of 25 years beginning July 14, 2017....

Read More+
TALOS REPORTS HISTORIC OIL DISCOVERY OFFSHORE MEXICO

July 13, 2017

Talos Energy as operator, together with its joint venture partners Sierra Oil and Gas and Premier Oil, is pleased to announce that the Zama-1 exploration...

Read More+
SHELL EXITS IRELAND UPSTREAM BUSINESS

July 13, 2017

Shell Energy Europe Limited has signed an offtake agreement for some 40% of the Corrib gas venture’s production for up to three years following completion....

Read More+
ENI BOOSTS ESTIMATES OF AMOCA FIELD OFFSHORE MEXICO

July 12, 2017

Eni has successfully drilled and tested the Amoca-3 well in the shallow waters of Campeche Bay, in offshore Mexico. It has proven the presence of multiple...

Read More+
SENEGAL: CAIRN HITS HYDROCABONS IN SANGOMAR DEEP

July 12, 2017

Cairn announces the results of the FAN South-1 well in the South Fan prospect offshore Senegal. The well encountered hydrocarbon bearing reservoir (Lower...

Read More+