September 24th, 2023
WOOD GROUP BAGS MAD DOG 2 CONTRACTS
Wood Group has won two separate contracts related to BP’s Mad Dog 2 project providing engineering services to further develop deepwater production.
Wood Group has been contracted by Samsung Heavy Industries to provide detailed engineering and procurement services for the topsides for BP’s Mad Dog Phase 2 floating production unit. The $80 million contract follows the December 2016 completion of Interim Agreement Period (IAP) early work, which was valued at $4.5 million.
Additionally, as part of the recently signed global services agreement with BP, Wood Group’s Specialist Technical Solutions (STS) business was awarded a $4.89 million contract for Subsea Engineering and Project Management Services to the Mad Dog 2 project. That work includes gas lift system interface design, geospatial information system support, subsea controls engineering and geotechnical engineering support. Mad Dog 2 is the second platform designed by Wood Group for BP in the Gulf of Mexico Mad Dog field. (Source: Wood Group)
Important News
- TEPCO – DISCHARGE OF FUKUSHIMA CONTAMINATED WATER TO THE OCEAN 27th August 2023
- NORWAY LOGS LARGEST HYDROCARBON DISCOVERY IN A DECADE 12th July 2023
- VOLOCOPTER AND ADP TO OFFER eVTOL SERVICES FOR THE 2024 OLYMPIC GAMES 25th June 2023
exhibitions And conferences
Exhibitions And Conferences
Email The Blog Post
Thank You!
The email has been sent to you successfully.
© Copyright 2023 Energy Global News. All Rights Reserved. | Developed By: Skylark Infotech